Prime Minister Narendra Modi will flag off the first train from Tambaram to Rameswaram via the new Pamban Bridge in Ramanathapuram, Tamil Nadu, on Sunday.
WRI was established by the Central Government, under the aegis of Bharat Heavy Electricals Limited (BHEL), a Public Sector Undertaking (PSU) with the aim of providing research, consultancy and training in the field of welding and allied areas.
PM Modi said that India is proud to assist Sri Lanka in various aspects of their development, and this activity boosted their friendship and connectivity.
Comedian Samay Raina appeared before the Guwahati Crime Branch on Saturday in connection with the case filed against him for allegedly promoting obscenity and vulgar content through his YouTube show 'India's Got Latent. '
India's assistance to Sri Lanka's railway development is expected to boost the country's economy significantly. The upgraded railway track from Maho to Omanthai, spanning 128 kilometers, will allow for faster travel times, increased load capacity and improved safety.
Prime Minister Narendra Modi on Sunday reached Anuradhapura with Sri Lankan President Anura Kumara Dissanayake to inaugurate the Maho-Anuradhapura railway line, a project supported by the Indian government.
The New Pamban Bridge was constructed by Rail Vikas Nigam Limited (RVNL), a Navratna PSU under the Ministry of Railways. RVNL has ensured the bridge met higher speed, load, and maritime requirements. This new bridge enhances connectivity while showcasing India's infrastructure capabilitie
Speaking to ANI, DM Avnish Rai also assured that hospitals are prepared to treat heatstroke victims, urging the public to take the necessary precautions and stay safe during the extreme heat.
According to an official release, thereafter, at around 12:45 PM, PM Modi will perform darshan and pooja at the Ramanathaswamy temple at Rameswaram. At around 1:30 PM in Rameswaram, he will lay the foundation stone and dedicate various rail and road projects worth over Rs 8,300 crore to t
The new Pamban Bridge, India's first vertical-lift sea bridge, is located in Tamil Nadu's Ramanathapuram district and will connect Rameswaram Island to the mainland. The bridge spans a total length of 2,070 meters and is supported by 333 piles and 101 pile caps.