ADD ANI AS A TRUSTED SOURCE
googleads
Menu

      
      NHSRCL refutes Congress’ claims of the Mumbai–Ahmedabad Bullet Tr

NHSRCL refutes Congress’ claims of the Mumbai–Ahmedabad Bullet Tr

The National High-Speed Rail Corporation Limited (NHSRCL) has officially rejected claims regarding the financial...

      
      Next-gen engineers step inside Mumbai–Ahmedabad Bullet Train site

Next-gen engineers step inside Mumbai–Ahmedabad Bullet Train site

These visits were designed to provide practical exposure to the engineers and to enable them to understand the...


      
      Railways to fast-track HSR projects

Railways to fast-track HSR projects

The Ministry of Railways has initiated steps to expedite the implementation of seven new High-Speed Rail (HSR)...


      
      NHSRCL signs agreement for Mumbai-Ahmedabad bullet train works

NHSRCL signs agreement for Mumbai-Ahmedabad bullet train works

National High Speed Rail Corporation Limited signed an agreement today with M/s Larsen & Toubro Limited for Design,...

      
      NHSRCL signs agreement with L&T in bullet train project

NHSRCL signs agreement with L&T in bullet train project

The National High Speed Rail Corporation Limited (NHSRCL) on Thursday signed an agreement with Larsen and Toubro...

      
      First full span box girder launched through launching gantry

First full span box girder launched through launching gantry

The National High-Speed Rail Corporation Limited (NHSRCL) has successfully launched the first full span Pre-Stressed...

      
      ECHO India Launches Antimicrobial Stewardship Program in Punjab

ECHO India Launches Antimicrobial Stewardship Program in Punjab

New Delhi [India], August 11: ECHO India, a non-profit trust working for health system strengthening through...

      
      2.7 km long continuous tunnel completed with first breakthrough

2.7 km long continuous tunnel completed with first breakthrough

Out of the total 21 km tunnel, 5 km is being constructed using the New Austrian Tunnelling Method (NATM) between...

      
      Maharashtra: Mumbai-Ahmedabad bullet train project in full swing

Maharashtra: Mumbai-Ahmedabad bullet train project in full swing

According to the NHSRCL, work on all three elevated stations in the state, Thane, Virar, and Boisar, is advancing...

      
      100 m steel bridge launched over DFC tracks in NHSRCL project

100 m steel bridge launched over DFC tracks in NHSRCL project

In a significant step forward for the Mumbai-Ahmedabad Bullet Train project, a 100-metre-long steel bridge has been...

      
       Mumbai-Ahmedabad bullet train project

Mumbai-Ahmedabad bullet train project

The adoption of the Full Span Launching Method has significantly accelerated construction, as full-span girder...

      
      300 km bullet train viaduct completed: Ashwini Vaishnaw

300 km bullet train viaduct completed: Ashwini Vaishnaw

Union Minister Ashwini Vaishnaw shared a video on X announcing the completion of 300 km of viaduct work for the...
Home About Us Our Products Advertise Contact Us Terms & Condition Privacy Policy

Copyright © aninews.in | All Rights Reserved.