No more GPR survey at Uttarakhand rescue site
Auger machine debris removed, manual drilling to start soon
Micro tunnelling expert Chris Cooper informed, on Monday, that all the debris of the auger machine has been...
Specialist carrying out manual digging details operation
Ex-Director General of BRO vouches for manual method in rescue op
Rat hole mining to be employed to remove debris through manual dr
In an effort to step up the rescue operations in Uttarkashi, a rat hole mining technique will be used through...
Devotees light 21,000 lamps in Har ki Paudi
Uttarkashi tunnel rescue: 31 metres of vertical drilling done
The vertical drilling from the top of the hill makes swift progress as 31 metres of drilling work has been...
"This is Uttarakhand govt's indolence and negligence," Congress
Uttarakhand Congress leader Yashpal Arya on Sunday lashed out at the Uttarakhand-led government over the ongoing...
"Vertical drilling of 19.2 meters completed...": NHIDCL MD
National Highways and Infrastructure Development Corporation Limited (NHIDCL) Managing Director Mahmood Ahmad on...
"86 meters of vertical drilling required": NDMA
Uttarkashi: Process of removing auger machine is underway
Indian Army called in for manual drilling at Uttarkashi Tunnel
The Indian Army has been called in at Uttarkashi's Silkyara tunnel for manual drilling at the site where 41...
Copyright © aninews.in | All Rights Reserved.