Prayers are being held for the safe passage of the 41 workers trapped inside the Silkyara tunnel in Uttarkashi since November 12, as the rescue operation enters its final stage.
Radhe Raman Dubey, a welder said he was brought the site to weld the mild steel wire of the pipes that are being inserted into the debris. According to the rescue plan the trapped men will be pulled out through the 900 mm pipes which will be pushed inside the debris till a distance of aro
Preparations to evacuate the 41 workers trapped in the Silkayara tunnel in Uttarakashi since November 12 are in the final stage, the Chief Minister's Office said in a press release.
The 41 workers have been trapped since November 12, when the under-construction tunnel from Silkyara to Barkot got blocked due to debris falling in a 60-meter stretch on the Silkyara side.
The workers have been trapped since November 12 when the under-construction tunnel from Silkyara to Barkot got blocked due to debris falling in a 60-meter stretch on the Silkyara side.
The rescue operations have entered the final stages at the Silkyara tunnel in Uttarkashi where 41 workers remain trapped as National Disaster Response Force (NDRF) personnel have entered the tunnel, an official statement issued by Chief Minister office said on Wednesday.
The Dedicated Freight Corridor Corporation of India Limited (DFCCIL) and Indian Railways (IR) have joined hands in running a special train carrying equipment from Karambeli in Gujarat to Rishikesh in Uttarakhand, spanning 1605 km, to aid in the rescue of the trapped workers in the Uttarkashi
Uttarakhand Chief Minister Pushkar Singh Dhami expressed his hopefulness in the ongoing rescue operation in Uttarkashi and said he is hopeful that all the workers will come out safely."