Karnataka Deputy Chief Minister DK Shivakumar said on Saturday that the protest against the Hemavati Link Canal project is a political protest. He said 40 per cent of the work is already done, and the project will not be stopped as it will help farmers. He also accused BJP leaders of trying
The project, awarded under the Tariff-Based Competitive Bidding (TBCB) mechanism and coordinated by REC Power Development and Consultancy Ltd (RECPDCL), will be implemented through a Special Purpose Vehicle (SPV) named WRNES Talegaon Power Transmission Ltd, which has now been formally transf
An incident of settlement of embankment and failure of RE Wall was reported on Ramanattukara-Valanchery Section of NH-66 in Kerala on May 19, 2025, when the project was nearing completion. While no deaths occurred due to the collapse of the embankment, multiple cars were stuck at the section
Bengaluru (Karnataka) [India], May 29: Mana Projects, a leading real estate player based in Bengaluru, today announced the launch of Mana Vista, a premium Park-Centric Residential Community located off Sarjapur Road. Located in one of Bengaluru's fastest-growing tech corridors, the venture o
Noida (Uttar Pradesh) [India], May 29: AU Real Estate, a prominent player in India's real estate sector, marks its entry into the Noida market with AU Aspire Silicon City in Sector 76, a luxury residential development that blends architectural innovation with ecological consciousness. The pr
The projects involve setting up additional lines between Ratlam-Nagda and Wardha-Balharshah, aiming to enhance connectivity and facilitate seamless transportation of passengers and goods.
In Nava Raipur, Chhattisgarh, India's first AI-based "RackBank Data Center SEZ" will be developed. This Special Economic Zone will be entirely dedicated to computers, the internet, and Artificial Intelligence (AI). The project is being developed by RackBank Datacenters Pvt. Ltd., with an inv
Officials said the proposal to divert 29.997 hectares of forest land for the project was cleared during a meeting held at Indira Paryavaran Bhawan in Delhi.
Sukhu called for safeguarding the interests of the state in hydropower projects and urged to fix a time limit for handing over the projects back to state
The company's USD 165 billion investment aims to build advanced semiconductor fabrication facilities in the state, but TSMC warned that tariffs could reduce demand for chips and jeopardize the project's success.
The project aims to divert surplus Godavari floodwater to drought-affected areas in Andhra Pradesh through a three-part water transfer system. It includes the Bollapalle reservoir, lift irrigation systems, and tunnels through the Nallamala hills.
The construction work for the bridge had to be stalled in late 2024 after the contractor withdrew from the project. A new tender has been floated today.