The Mumbai Ahmedabad Bullet Train project has successfully completed the launching of a 130 m span of a 230 m (130 +100) long steel bridge over National Highway-64 and Bharuch Dahej freight line of Indian Railway tracks near Kanthariya village, Bharuch district, Gujarat.
The Mumbai-Ahmedabad Bullet Train project has successfully completed the launch of its 10th steel bridge in Ahmedabad, Gujarat. The bridge, spanning 60 meters in length, was launched over a western railway facility (laundry) situated adjacent to the railway tracks.
In a significant step forward for the Mumbai-Ahmedabad Bullet Train project, a 100-metre-long steel bridge has been successfully launched over the Dedicated Freight Corridor (DFC) tracks near Bharuch in Gujarat, according to a press release by National High Speed Rail Corporation Limited (NH
In a significant milestone for the Mumbai-Ahmedabad Bullet Train project, the first 100-metre span of a 2 X 100 metre long steel bridge was successfully launched over the bustling NH-48 near Nadiad, Gujarat, the National High Speed Rail Corporation Limited (NHSRCL) announced on Friday.
Another steel bridge of 100 m length has been launched for the Mumbai-Ahmedabad Bullet Train Project on August 25 near Silvassa in Dadra & Nagar Haveli, a press release stated.