The climate in the state changed after it received rainfall late on Sunday night and it continued intermittently on Monday as well in various parts of the state. The state Bhopal also remained cloudy and received rainfall intermittently throughout the day.
After the spectacular celebration of Dev Diwali in Varanasi, illuminating the city's ghats with 12 lakh earthen lamps; the city's administration has demonstrated efficiency in cleaning these lamps overnight, ensuring that the ghats remain pristine and welcoming for devotees.
Blinken will discuss Israel's right to defend itself in accordance with international humanitarian law, continued efforts to secure the release of remaining hostages and protecting civilian life during Israel's counter-offensive against Hamas in Gaza.
National Highways and Infrastructure Development Corporation Limited (NHIDCL) Managing Director Mahmood Ahmad on Monday informed that the vertical drilling of 36 meters has been completed inside the Uttarkashi's Silkayara tunnel where 41 workers remain trapped.
Tehsildar and Magistrate Harveer Singh (JKAS) were the chief guests. This was the ninth mega-cultural event in the difficult and hilly terrain of the Pir Panchal range of Jammu and Kashmir, spread over nine districts.
They're staying in a cramped two-bedroom apartment that someone kindly made available. But the women's apparel store back in Ashkelon that she owns remains closed. After 52 days of war, the Wieners -- and thousands of other Israeli evacuees -- are stretched to their financial limits.
According to the air pollution data shared by the Punjab Environment Protection Department, Upper Mall remained the most polluted locality with a 508 Air Quality Index reading.
National Highways and Infrastructure Development Corporation Limited (NHIDCL) Managing Director Mahmood Ahmad on Monday informed that the work of the vertical drilling at Uttarkashi tunnel where 41 workers remained trapped is likely to be completed by November 30.
National Highways and Infrastructure Development Corporation Limited (NHIDCL) Managing Director Mahmood Ahmad on Sunday informed that a total of 19.2 meters of vertical drilling has been completed at Uttarkashi's tunnel where 41 workers remained trapped.
National Disaster Management Authority Member, Lt General (Rtd) Syed Ata Hasnain on Sunday said that 86 meters of vertical drilling is required to reach the crust of the Uttarkashi's tunnel where 41 workers remained trapped adding that 17 meters of the drilling has already taken place.
The Indian Army has been called in at Uttarkashi's Silkyara tunnel for manual drilling at the site where 41 workers have remained trapped for the past 15 days.