The first Vande Bharat Express on the Katra-Srinagar route began its journey after Prime Minister Narendra Modi flagged off the train yesterday. Passengers gathered at Katra Railway Station to board the train.
The Lok Sabha passed the Coastal Shipping Bill, 2024, paving the way for a dedicated legal framework for coastal trade as the maritime sector aims to provide a economical, reliable and sustainable mode of transportation as it decongest road and rail network.
Santa Clara (California) [US] / Bengaluru (Karnataka) [India], March 19: L&T Technology Services Limited (BSE: 540115, NSE: LTTS), a global leader in engineering and technology services, today announced the launch of TrackEi™, an AI-powered railway track inspection solution. Design
India now boasts the second-largest road network in the world, the third-largest metro rail network, and the fourth-largest rail network. He also highlighted that 136 Vande Bharat trains are running in the country, and 97 percent of the broad-gauge network has been electrified.
"It is the misfortune of the country that there is no full-time Railway Minister for the fourth largest rail network in the world," Kakkar, the chief national spokesperson of AAP, posted on X.
Indian Railways has taken up electrification of Broad Gauge Railway lines in a mission mode and completed electrification of about 97 per cent of the total Broad Gauge Network, said Union Minister of Railways, Information and Broadcasting and Electronics & Information Technology, Ashwin
Union Minister of Railways, Information & Broadcasting, and Electronics and Information Technology, Ashwini Vaishnaw, recently provided detailed insights into three major railway infrastructure projects that have been approved by the Cabinet Committee on Economic Affairs (CCEA) which wil
Etihad Rail, the developer and operator of the UAE National Rail Network, signed a landmark agreement with Emerge, a joint venture between Abu Dhabi Future Energy Company PJSC - Masdar and EDF Group to solarise the railway network's freight terminal in Ghuweifat.
RITES Ltd., a PSU transport infrastructure consultancy, has signed a Memorandum of Understanding (MoU) with Etihad Rail, the developer and operator of the UAE National Rail Network, the company informed the exchange on Wednesday.
The project completion cost is Rs 63,246 crore and is planned to be completed by 2027. Once Phase-II is fully operational, Chennai will have a total Metro Rail network of 173 Km.
The Union Cabinet chaired by Prime Minister Narendra Modi on Thursday approved the proposal of the Ministry of Housing & Urban Affairs for Chennai Metro Rail Project Phase-II comprising three corridors. The total length of the approved lines will be 118.9 km with 128 stations.