"The bridge, spanning a total length of 3.6 kilometers, is expected to be completed by June 2028. It would feature a 5.3-kilometer four-lane road connecting Palashbari and a 2-kilometer route to Sualkuchi, alongside elevated roads to protect the wetlands north of Sualkuchi," CM Sarma said.