A major breakthrough has been achieved in the second mountain tunnel in Palghar district of Maharashtra. This tunnel is 454 meters long and 14.4 meters wide, and it will accommodate both the 'up' and 'down' tracks for the Mumbai-Ahmedabad Bullet Train project.