Acting on instructions from the Police Headquarters in Dehradun, flood company personnel of the Uttarakhand Police carried out inspections of disaster-affected routes on Sunday. He left for the site of the incident on foot for search and rescue work.
he father of the RG Kar Medical College rape and murder victim has alleged that his wife was assaulted by women police personnel during the Nabanna Abhiyan rally on August 9. The rally was called to mark the first anniversary of the incident of rape and murder at RG Kar Medical College.
The arrested accused, identified as Dev Vart alias Mohla (33), a resident of Majra Dabas, Delhi, was involved in the firing incident of PS Kanjhwala. "Illegal weapon, including a semi-automatic Pistol with 01 live rounds recovered," officials said, adding that the accused had a firing spree
A massive fire broke out in a mushroom cold storage in Uttar Pradesh's Mainpuri on Sunday. More than a dozen fire engines were deployed to bring the situation under control, police said.
New Delhi Deputy Commissioner of Police (DCP) Devesh Kumar Mahla informed that the incident happened around 6:30 AM when a car driven by a 26-year-old Ashish collided with two pedestrians on a footpath. Ashish, who was driving a car belonging to his friend from Gurgaon to Shakarpur, was deta
Two siblings were killed and their father injured in a Karachi road accident involving a dumper. The incident sparked protests and mob violence, with several dumpers set on fire. Police arrested 14 suspects and are investigating, as traffic accidents involving heavy vehicles rise in the city
The cumulative report for the period from June 20 to August 9 shows that the rains have caused extensive damage to public and private property, livestock, crops, and essential infrastructure across the state. Over 1,98,881 lakh rupees in total losses have been recorded.
A huge fire broke out in many school bag shops at Hansi Gate in Bhiwani at 2:30 am this morning due to a short circuit. Goods worth lakhs of rupees were reduced to ashes by the fire, as per the Fire Department.
"It is being said that construction work was ongoing and due to vibrations (of equipment), it all collapsed at once. There is a 4-5 ft tall pile of debris here."
"When RCC (Reinforced Cement Concrete) for slab was being put in, it collapsed. The labourers who were working suffered minor injuries. They were 15-16 in number."