Search For "hydroelectric power project"
J-K: Baglihar Dam in Ramban opens all spillway gates following heavy rain
Updated : 9 months, 2 weeks ago IST
All the spillway gates of the Baglihar Hydroelectric Power Project in Jammu and Kashmir's Ramban district have been opened following heavy rainfall. The district authorities issued warnings to the general public not to go near the riverbank.
Read More
J-K: Chenab river overflows amid heavy rainfall, administration people not
Updated : 11 months ago IST
While speaking to ANI, DIG Patil said, "All of you must have noticed that the water level has risen in the Chenab River. One incident has also come to our notice in the Doda district, in which some people have lost their lives. I appeal to all people not to go near the rivers... The water
Read More
Himachal: Larji Power Project restored and fully operational once again
Updated : 1 year ago IST
The 126 MW Larji Hydroelectric Power Project in Kullu district has been fully restored and is operational once again, which suffered extensive damage from the devastating Beas River floods on 9th and 10th July 2023, said an official statement on Sunday.
Read More
J-K Chief Secretary visits Kishtwar; inspects Rattle, Dul Hasti Hydroelect
Updated : 1 year ago IST
Jammu and Kashmir Chief Secretary Atal Dulloo on Friday visited Kishtwar district and inspected the ongoing works and operational status of two major hydroelectric power projects, including the 850 MW Rattle Hydroelectric Power Project and the 390 MW Dul Hasti Hydroelectric Power Station.
Read More
All gates of Baglihar Dam on Chenab river closed in Ramban
Updated : 1 year ago IST
All gates of the Baglihar Dam on the Chenab River in Ramban, Jammu and Kashmir, are currently closed. Visuals from the site show the shut gates, and officials are monitoring the situation.
Read More
Gates of Baglihar Hydroelectric Power Project Dam remain closed
Updated : 1 year ago IST
All the gates of the Baglihar Hydroelectric Power Project Dam, which is built on the Chenab river in Ramban, have been closed for the second consecutive day.
Read More
Gates of Baglihar Power Project Dam in J-K closed
Updated : 1 year ago IST
All gates of the Baglihar Hydroelectric power project Dam built on the Chenab river in Ramban have been closed
Read More
J&K: Two gates of Baglihar Dam opened after heavy rainfall
Updated : 1 year ago IST
The two gates of the Baglihar Hydroelectric Power Project Dam built on the Chenab River in Ramban have been opened.
Read More
J-K: Gates of Baglihar Dam remain closed after suspension of Indus Water T
Updated : 1 year ago IST
All gates of the Baglihar Hydroelectric Power Project Dam on the Chenab River in Jammu and Kashmir's Ramban district remain closed, even as a limited volume of water continues to flow downstream.
Read More
All gates of Salal Dam on Chenab River closed, significant drop in water l
Updated : 1 year ago IST
All the gates of Salal Dam on Chenab River were closed resulting in a significant drop in water levels in the Reasi district on Monday.
Read More
IREDA to invest Rs 290 cr in Nepal 900 MW hydro projects
Updated : 1 year, 10 months ago IST
The Indian Renewable Energy Development Agency Limited (IREDA) has announced a strategic investment in a 900 MW hydroelectric power project in Nepal.
Read More
CBI searches over 30 locations for alleged irregularities in Kiru Hydroele
Updated : 2 years, 3 months ago IST
The Central Bureau of Investigation (CBI) has conducted searches at more than 30 locations in eight States and Union Territories in an ongoing investigation of a case pertaining to allegations of irregularities in the award of civil works for the Kiru Hydroelectric Power Project in Jammu and
Read More