ADD ANI AS A TRUSTED SOURCE
googleads
Menu

      
       J-K: Baglihar Dam in Ramban opens all spillway gates following h

 J-K: Baglihar Dam in Ramban opens all spillway gates following h

All the spillway gates of the Baglihar Hydroelectric Power Project in Jammu and Kashmir's Ramban district have been...

      
      J-K: Chenab river overflows amid heavy rainfall

J-K: Chenab river overflows amid heavy rainfall

While speaking to ANI, DIG Patil said, "All of you must have noticed that the water level has risen in the Chenab...


      
      Himachal: Larji Power Project restored and fully operational

Himachal: Larji Power Project restored and fully operational

The 126 MW Larji Hydroelectric Power Project in Kullu district has been fully restored and is operational once...

      
      J-K Chief Secretary visits Kishtwar; inspects Rattle projects

J-K Chief Secretary visits Kishtwar; inspects Rattle projects

Jammu and Kashmir Chief Secretary Atal Dulloo on Friday visited Kishtwar district and inspected the ongoing works...


      
      All gates closed at Baglihar Dam in Jammu and Kashmir's Ramban

All gates closed at Baglihar Dam in Jammu and Kashmir's Ramban

All gates of the Baglihar Dam on the Chenab River in Ramban, Jammu and Kashmir, are currently closed. Visuals from...

      
      Gates of Baglihar Hydroelectric Power Project Dam remain closed

Gates of Baglihar Hydroelectric Power Project Dam remain closed

All the gates of the Baglihar Hydroelectric Power Project Dam, which is built on the Chenab river in Ramban, have...

      
      Gates of Baglihar Power Project Dam in J-K closed 

Gates of Baglihar Power Project Dam in J-K closed 

All gates of the Baglihar Hydroelectric power project Dam built on the Chenab river in Ramban have been closed

      
      J&K: Two gates of Baglihar Dam opened due to heavy rainfall

J&K: Two gates of Baglihar Dam opened due to heavy rainfall

The two gates of the Baglihar Hydroelectric Power Project Dam built on the Chenab River in Ramban have been opened.

      
      Gates of Baglihar Dam remains closed after India suspends IWT

Gates of Baglihar Dam remains closed after India suspends IWT

All gates of the Baglihar Hydroelectric Power Project Dam on the Chenab River in Jammu and Kashmir's Ramban...


      
      All gates of Salal Dam on Chenab River closed

All gates of Salal Dam on Chenab River closed

All the gates of Salal Dam on Chenab River were closed resulting in a significant drop in water levels in the...


      
      IREDA to invest Rs 290 cr in Nepal hydro projects

IREDA to invest Rs 290 cr in Nepal hydro projects

The Indian Renewable Energy Development Agency Limited (IREDA) has announced a strategic investment in a 900 MW...

      
      CBI raids over 30 locations in alleged irregularities in Kiru HPP

CBI raids over 30 locations in alleged irregularities in Kiru HPP

The Central Bureau of Investigation (CBI) has conducted searches at more than 30 locations in eight States and Union...
Home About Us Our Products Advertise Contact Us Terms & Condition Privacy Policy

Copyright © aninews.in | All Rights Reserved.