India's first 508 km long Bullet Train corridor is being constructed between Mumbai and Ahmedabad. Out of 508 km, 323 km of viaduct and 399 km of pier work have been completed, including 17 River bridges, five PSC (pre-stressed concrete) and nine Steel bridges.
National High Speed Rail Corporation Limited signed an agreement today with M/s Larsen & Toubro Limited for Design, Supply and Construction of Track and Track-related Works, including Testing and Commissioning for Double Line High Speed Railway in the state of Maharashtra.
The National High Speed Rail Corporation Limited (NHSRCL) on Thursday signed an agreement with Larsen and Toubro (L&T) for the design, supply, construction, testing and commissioning of the Mumbai-Ahmedabad high-speed train project.
The National High-Speed Rail Corporation Limited (NHSRCL) has successfully launched the first full span Pre-Stressed Concrete (PSC) Box Girder of 40 meters length through the full span launching gantry (FSLG) in the Maharashtra section of the Mumbai-Ahmedabad Bullet Train corridor, at Sakhar
According to the NHSRCL, work on all three elevated stations in the state, Thane, Virar, and Boisar, is advancing swiftly, and the first slabs for Virar and Boisar stations have recently been cast.
In a significant step forward for the Mumbai-Ahmedabad Bullet Train project, a 100-metre-long steel bridge has been successfully launched over the Dedicated Freight Corridor (DFC) tracks near Bharuch in Gujarat, according to a press release by National High Speed Rail Corporation Limited (NH
The adoption of the Full Span Launching Method has significantly accelerated construction, as full-span girder erection is up to ten (10) times faster than conventional segmental methods
Union Minister Ashwini Vaishnaw shared a video on X announcing the completion of 300 km of viaduct work for the Bullet Train project, marking a major progress milestone in India's high-speed rail initiative.
In a significant milestone for the Mumbai-Ahmedabad Bullet Train project, the first 100-metre span of a 2 X 100 metre long steel bridge was successfully launched over the bustling NH-48 near Nadiad, Gujarat, the National High Speed Rail Corporation Limited (NHSRCL) announced on Friday.
New Delhi [India], April 9: The Mumbai-to-Dubai dream of commuting in a mere two hours is not far away with the planned undersea high-speed rail. The ambitious project, guided by UAE's National Advisor Bureau Limited, plans to bridge India and the UAE using an underwater train, Dubai. If rea