ADD ANI AS A TRUSTED SOURCE
googleads
Menu

"Vertical drilling of 19.2 meters completed...": NHIDCL MD

National Highways and Infrastructure Development Corporation Limited (NHIDCL) Managing Director Mahmood Ahmad on...

"86 meters of vertical drilling required": NDMA

National Disaster Management Authority Member, Lt General (Rtd) Syed Ata Hasnain on Sunday said that 86 meters of...

      
      Indian Army called in for manual drilling at Uttarkashi Tunnel

Indian Army called in for manual drilling at Uttarkashi Tunnel

The Indian Army has been called in at Uttarkashi's Silkyara tunnel for manual drilling at the site where 41...


      
      Vertical drilling of Uttarkashi tunnel begins to rescue workers

Vertical drilling of Uttarkashi tunnel begins to rescue workers

The vertical drilling to rescue the trapped workers in the Silkyara tunnel, which was halted earlier today, has...


      
      Rescuers make 8-metre progress through vertical drilling

Rescuers make 8-metre progress through vertical drilling

With vertical drilling underway to further aid the rescue of the trapped workers in Silkyara tunnel, the rescuers...


      
      Vertical drilling underway to rescue workers trapped in tunnel

Vertical drilling underway to rescue workers trapped in tunnel

Vertical drilling, one of the several chalked-out options to bring out 41 workers who have been trapped inside...


      
      Plasma cutter flown from Hyderabad to cut auger machine

Plasma cutter flown from Hyderabad to cut auger machine

National Disaster Management Authority Member, Lt General Syed Ata Hasnain (retired) on Saturday said that there has...

      
      No movement in last 24 hours: NDMA on Uttarkashi tunnel collapse

No movement in last 24 hours: NDMA on Uttarkashi tunnel collapse

National Disaster Management Authority Member, Lt General (Rtd) Syed Ata Hasnain on Saturday said that there has...

"Cutter from Hyderabad being flown in, manual drilling tomorrow"

"Everyone knows that this rescue operation is being done under difficult & challenging circumstances. The...


      
      Uttarkashi tunnel op: Vertical drilling team on standby mode

Uttarkashi tunnel op: Vertical drilling team on standby mode

An SJVN official said, "We have given a proposal to the administration to do vertical drilling in 5 to 6 days;...


      
      Uttarkashi: BRO to transport machines for vertical drilling

Uttarkashi: BRO to transport machines for vertical drilling

"Soon, a joint meeting of all the concerned departments is going to be held and in that meeting, a decision will...


      
      Tunnel: Manual drilling to start once Auger removed from pipeline

Tunnel: Manual drilling to start once Auger removed from pipeline

Manual drilling will start soon to cut through the debris that separates rescuers from the 41 trapped workers in...

Home About Us Our Products Advertise Contact Us Terms & Condition Privacy Policy

Copyright © aninews.in | All Rights Reserved.