"Take a look at our local newspapers - both from Jammu and from Srinagar, English & vernacular. You'll be able to distinguish the cowards from the ones with guts. The cowards have completely buried the fact that the entire elected government was locked up yesterday, along with most el
According to the statement, 51 per cent of the minor patchwork and 40 per cent of the major patchwork on the state's damaged roads have been completed. Additionally, over 62 per cent of the work to fill small potholes has been finished.
In a high-level meeting of Kanwar Yatra recently with Chief Minister Yogi Adityanath, officials said that about 6 crore devotees from various states, including Uttar Pradesh, can join the Kanwar Yatra, who will complete their journey through the state. In this, 10-12 per cent i.e. 60 to 70 l
The 18-year-old sensation had a conversation with his club's official media team. The Spanish giants aimed for the UEFA Champions League crown last season, but their dreams were crushed by Inter Milan in a thrilling semifinal clash. Nonetheless at domestic level, the club was able to complet
Chief Minister Bhupendra Patel has issued clear directives to the Roads & Buildings Department to ensure that all such damaged roads are promptly repaired, with strict instructions to complete the work at the earliest.
"The state government has been completely deflecting the criticism and allegations that are being levied against it. Time and again, this innocent girl has been raising the complaint...The authorities have failed to give her protection. Unfortunately, she is also a member of the ABVP, and th
While technically a caught-and-bowled chance, Bashir was struck firmly on the hand and immediately signalled up to the home dressing room that he had been injured, sustaining what appeared to be a dislocation. Joe Root completed his over.
BRO Commanding Officer Major Aditya Sharma said, "Road construction work is going on in full swing. We are constructing a total of 114 km of road. It contains a total of 4 packages. Currently, packages 1 and 2 are in full swing. Out of 114 km, the 50th km work is ongoing, and this will soon
The Election Commission of India (ECI) said 80.11 per cent electors in Bihar submitted their forms, adding that the commission is moving ahead to complete the collection of Enumeration Forms (EFs) before the stipulated time, July 25.
"The pilot did everything right. It is part of the training that when engines fail, you attempt to restart them. The report also suggests that the fuel switch is in the run position. This aircraft has an FADEC (Full Authority Digital Engine Control) system in place. When you start the engine
According to an official statement from Uttarakhand's information officer, a road was broken due to the landslide in Ojri. The DM inspected the Bailey bridge being built at the said place and directed to check the quality of the construction work and complete it within the stipulated time fr
Selected in 2016 under the Fast Track Round of the mission, Imphal Smart City is currently implementing 24 urban development projects, with 17 already completed and the remaining 7 on track for completion by August 2025, according to Th. Harikumar Singh, CEO of Imphal Smart City Ltd.