The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, has approved four railway multitracking projects worth Rs 24,634 crore, covering 18 districts across Maharashtra, Madhya Pradesh, Gujarat, and Chhattisgarh.
According to a release by Cabinet Committee on Economic Affairs (CCEA), with a total estimated cost of Rs 24,634 crore, these projects aim to expand the Indian Railways network by approximately 894 kilometers and are expected to be completed by 2030-31.
The Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Shri Narendra Modi, has approved an increase in the Minimum Support Prices (MSP) for all mandated Rabi Crops for the Marketing Season 2026-27.
The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, on Wednesday approved the doubling of the Bakhtiyarpur - Rajgir - Tilaiya single railway line section (104 km) in Bihar with a total approximate cost of Rs. 2,192 crore.
The proposed four-lane greenfield project aims to improve connectivity between Bihar's capital, Patna, and Bettiah, connecting the northern districts of the state, including Vaishali, Saran, Siwan, Gopalganj, Muzaffarpur, East Champaran, and West Champaran, up to the areas along the Indo-Nep
In a major boost to infrastructure and connectivity, the Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, on Wednesday approved two key development projects in Bihar, Jharkhand, and West Bengal, the doubling of the Bhagalpur-Dumka-Rampurhat railway line and
The Cabinet Committee on Economic Affairs, approved the construction of a 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor.
The Union Cabinet, chaired by Prime Minister Narendra Modi, approved four projects of the Ministry of Railways with a total estimated cost of Rs. 12,328 Crore (approx.).
The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, on Tuesday approved the construction of a 6-lane Access-Controlled Capital Region Ring Road (Bhubaneswar Bypass - 110.875 km) in Odisha on Hybrid Annuity Mode (HAM) at a total capital cost of Rs 8307.74 cr
The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, today approved the proposal of the Airports Authority of India (AAI) for the development of the Green Field Airport at Kota-Bundi (Rajasthan) at an estimated cost of Rs 1507.00 Crore.
The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, on Tuesday approved investment of Rs 8146.21 crore for the construction of the Tato-II Hydro Electric Project (HEP) in the Shi Yomi District of Arunachal Pradesh.
The Cabinet Committee on Economic Affairs, chaired by the Prime Minister, has approved the construction of a 4-lane Marakkanam - Puducherry (46 km) in Tamil Nadu. The project will be developed on Hybrid Annuity Mode (HAM) at a total capital cost of Rs 2,157 crore, said a statement from the C