15 among 41 trapped workers rescued from tunnel
Fifteen workers among the 41 workers trapped inside the Silkyara tunnel in Uttarakhand since November 12, have...
Uttarkashi: First worker brought out of Silkyara tunnel
After 17 days of the marathon operation, the first worker out of 41 workers has been evacuated from the Silkyara...
Tunnel rescue: Sarma tracks state of 2 workers from Assam
"Near breakthrough; 2 metres drilling still left": NDMA
National Disaster Management Authority Member, Lt General (Rtd) Syed Ata Hasnain on Tuesday said that the rescue...
Pipe laying work completed, evacuation soon: CM Dhami
Uttarakhand Chief Minister Pushkar Singh Dhami said that the pipe laying work inside the Silkyara tunnel where...
PM Modi speaks to CM Dhami on tunnel rescue operations
With operations to safely evacuate 41 trapped labourers out of the Silkyara tunnel underway, Prime Minister...
Multi-pronged operations underway with vertical, manual drilling
The efforts to rescue 41 trapped labourers are progressing on multiple fronts with both vertical and manual...
“Will bring them out soon”: Workers assert confidence
The workers involved in rat-hole mining inside the Silkyara tunnel to rescue 41 trapped labourers asserted...
Govt leaving no stone unturned: PM Modi on Uttarkashi rescue op
Prime Minister Narendra Modi on Monday said that the government and all the agencies together are leaving no...
"Vertical drilling of 36 meters completed inside tunnel": NHIDCL
National Highways and Infrastructure Development Corporation Limited (NHIDCL) Managing Director Mahmood Ahmad on...
Vertical drilling in tunnel could get over by Nov 30: Officials
National Highways and Infrastructure Development Corporation Limited (NHIDCL) Managing Director Mahmood Ahmad on...
Delegation led by Principal Secy to PM oversees ongoing rescue op
A delegation led by Principal Secretary to Prime Minister, Pramod Kumar Mishra took stock of ongoing efforts to...
Copyright © aninews.in | All Rights Reserved.