India's first 508 km long Bullet Train corridor is being constructed between Mumbai and Ahmedabad. Out of 508 km, 323 km of viaduct and 399 km of pier work have been completed, including 17 River bridges, five PSC (pre-stressed concrete) and nine Steel bridges.
India reaffirmed its support to Nepal by supplying the first consignment of components for 10 prefabricated steel bridges. This infrastructure support aims to restore road connectivity disrupted by recent devastating floods and landslides.
Researchers from Tokyo Metropolitan University have carried out a detailed simulation showing how a common type of bridge fails during large-scale earthquakes. They modeled "I-shaped girder" bridges, looking at the step-by-step mechanism by which they yield and deform under lateral forces, s
Mumbai (Maharashtra) [India], Jan 29 (ANI): The heavy civil infrastructure business of L&T Construction has secured a contract to supply 28 bridges for Mumbai Ahmedabad High-Speed Rail Corridor.