The National High-Speed Rail Corporation Limited (NHSRCL) has successfully launched the first full span Pre-Stressed Concrete (PSC) Box Girder of 40 meters length through the full span launching gantry (FSLG) in the Maharashtra section of the Mumbai-Ahmedabad Bullet Train corridor, at Sakhar
According to the NHSRCL, work on all three elevated stations in the state, Thane, Virar, and Boisar, is advancing swiftly, and the first slabs for Virar and Boisar stations have recently been cast.