ADD ANI AS A TRUSTED SOURCE
googleads
Menu
Politics

Andhra CM Chandrababu Naidu reviews statewide road repairs

Andhra Pradesh Chief Minister Nara Chandrababu Naidu conducted a review meeting at the Secretariat to assess the ongoing road repair works across the state. The meeting was attended by Minister BC Janardhan Reddy and senior officials.

ANI Nov 25, 2024 22:43 IST googleads

Andhra Pradesh Chief Minister Nara Chandrababu Naidu (Photo/ANI)

Amaravathi (Andhra Pradesh) [India], November 25 (ANI): Andhra Pradesh Chief Minister Nara Chandrababu Naidu held a review meeting at the Secretariat to assess the ongoing road repair works across the state. The meeting was attended by Minister BC Janardhan Reddy and senior officials.
Chief Minister Naidu reviewed the progress of the pothole-free roads initiative, valued at Rs861 crore. Launched on November 2 in Anakapalli district, the programme is expected to be completed by Sankranti. The CM stressed that substandard work would not be tolerated and directed officials to ensure road repairs meet high-quality standards. He instructed that contractors failing to maintain quality be blacklisted and suggested engaging private agencies to assess the quality of road construction, according to the official release.
The CM emphasised the importance of comprehensive road repairs to ensure public satisfaction. Over the past 20 days, pothole repair works have been underway across the state. During the review meeting, officials briefed the CM on the progress. Of the 45,378 km R&B road network in the state, 22,299 km required repairs. With Rs861 crore allocated by the government, significant progress has been made, with potholes on 1,991 km of roads already filled. However, officials noted that 1,447 km of roads are beyond repair and require complete reconstruction, estimated to cost Rs581 crore. The CM assured that additional funds would be allocated for this, as per the release.
Additionally, 23,521 km require jungle clearance, which would cost Rs33 crore. The CM instructed officials to initiate these works soon. Of the state's 12,653 km of highways, 10,200 km have been identified for development under the PPP model. In the first phase, 18 roads covering 1,307 km will be constructed using the PPP approach. Detailed project reports (DPRs) are being prepared, and the CM urged officials to commence work promptly.
Under the PPP model, roads will be built using methods such as DBFOT (Design, Build, Finance, Operate, and Transfer), BOT (Build Operate Transfer), HAM (Hybrid Annuity Model), TOT (Toll, Operate, and Transfer), and OMT (Operate, Maintain, and Transfer). Proposed roads include Chilakapalem-Ramabhadrapuram-Rayagada, Vizianagaram-Palakonda, Kalingapatnam-Srikakulam-Parvathipuram, Bheemunipatnam-Narsipatnam, Kakinada-Jonnada, Kakinada-Rajahmundry Canal, Eluru-Medisettivaripalem, Narsapuram-Aswaraopeta, Eluru-Jangareddygudem, Guntur-Parchur, Guntur-Bapatla, Mangalagiri-Tenali-Narakoduru, Bestavaripeta-Ongole, Rajampet-Gudur, Peddapalli-Banaganapalli, Damajipalli-Tadipatri, Jammalamadugu-Kolimigundla, and Somandepalli-Hindupur-Tumakuru, added the release.
The CM noted that, as with PPP-mode national highways, quality roads for state highways would likely garner public support. He recommended carefully considering toll fees and proposed exemptions for two-wheelers, autos, and tractors, with charges applicable only to heavy and transport vehicles. To ensure financial feasibility for road construction agencies, the government will provide viability gap funding, the release stated.
Accelerating NDB-funded projects, the CM directed officials to expedite works financed by the New Development Bank (NDB). Of the 666 km planned under Phase 1, only 173 km (26%) has been completed. He urged officials to fast-track these projects.
The CM also reviewed the condition of internal village roads. Of the 68,000 km of internal roads, 55,000 km are cement concrete (CC) roads. While 25,000 km of CC roads were constructed during the previous TDP government, only 6,000 km were completed under the YSRCP tenure. The CM urged officials to complete the remaining works using NREGA funds and central government grants. Recently, the Centre allocated an additional Rs275 crore to panchayats, which should be utilised for internal road construction. The CM also suggested leveraging NABARD funds for building rural roads and emphasised improving connectivity from villages to state and national highways, the release added. (ANI)

Get the App

What to Read Next

Politics

YSRCP files PIL challenging Andhra Pradesh govt’s land policy

YSRCP files PIL challenging Andhra Pradesh govt’s land policy

Former Andhra Pradesh Minister Gudivada Amarnath on Thursday said that the YSR Congress Party (YSRCP) has filed a Public Interest Litigation (PIL) challenging the land policy of the state government, alleging that large extents of valuable public land are being allotted to a few real estate companies at very low prices.

Read More
General News

Woman found dead in hotel room in North Delhi

Woman found dead in hotel room in North Delhi

According to Delhi Police, around 12:30 am, staff of Prince Hotel located at SPM T-point on Church Mission Road informed the beat staff that Room No. 205 was locked and the guest inside was not responding despite repeated knocking.

Read More
Politics

"No shortage of petrol, diesel or LPG": Hardeep Singh Puri

In his statement in the Lok Sabha, Puri said the government has taken multiple measures to safeguard the country's energy security and ensure the uninterrupted availability of petroleum products, cooking gas, and natural gas.

Read More
General News

FCI workers' demands raised before Labour Authority

FCI workers' demands raised before Labour Authority

The ongoing dispute between the management of the Food Corporation of India (FCI) and its sole recognised union, Bhartiya Khadya Nigam Karamchari Sangh (BKNKS), was taken up for conciliation on Thursday before the Deputy Chief Labour Commissioner (Central) in New Delhi.

Read More
General News

Fire breaks out at Sheikh Sarai Transport Authority record room

Fire breaks out at Sheikh Sarai Transport Authority record room

A fire broke out at the old Transport Authority building in Sheikh Sarai Phase 2 area of Delhi on Wednesday night, gutting important documents stored in the record room, officials said.

Read More
Home About Us Our Products Advertise Contact Us Terms & Condition Privacy Policy

Copyright © aninews.in | All Rights Reserved.