ADD ANI AS A TRUSTED SOURCE
googleads
Menu
General News

Multi-modal transport hub at Sabarmati soon

Mumbai (Maharashtra) [India], Jan 23 (ANI): In a first, the Sabarmati station on the Mumbai-Ahmedabad bullet train network will soon be turned into a vibrant Multimodal Transport Hub, said National High Speed Rail Corporation Limited (NHSRCL).

ANI Jan 23, 2019 09:54 IST googleads

Bullet train (Representational Image)

Mumbai (Maharashtra) [India], Jan 23 (ANI): In a first, the Sabarmati station on the Mumbai-Ahmedabad bullet train network will soon be turned into a vibrant Multimodal Transport Hub, said National High Speed Rail Corporation Limited (NHSRCL).
The hub is being established to enable seamless transit - with simple connectivity between the railway station, bus terminal and other transport modes in the city.
"To achieve seamless integration of various transport modes around the HSR station, a multi-modal transit terminal has been planned on the East side of Sabarmati HSR station which shall ensure smooth traffic flow in the influence area of HSR station. The Multi-Modal Integration schemes focus on the integration of existing and planned transit facilities in the station area. The available RoW along existing road network has been optimally utilized for planning the inflow/outflow of estimated traffic in horizon years," read a statement issued by the NHSRCL.
Some of the special features of the Sabarmati station are as follows:
- Sabarmati HSR station is proposed in the yards of the railway station. The proposed station will have connectivity from both sides (broad gauge in west and meter gauge in east) of the railway station (SBT & SBI).
- Proposed Passenger Terminal Hub provides connectivity to HSR Station, both sides of Western Railway Stations, AEC Metro Station and BRTS via FOB's.
- Three Foot Over Bridges (FOB) have been planned for smooth passenger flow, namely:
* FOB 1 (10m wide and 280m in length) connects Terminal Hub building with the Sabarmati (Meter gauge) Railway station and HSR Stations. Travellators will be installed in the FOB for ease of passengers;
*FOB 2 (length of 361m) provides connectivity between Unpaid concourse of Terminal Hub building and unpaid concourse AEC Metro Station and the BRTS station of Sabarmati Power House;
*FOB 3 (8m wide and length of 320m) connects the Unpaid concourse of HSR stations with Railway Platforms of Sabarmati broad gauge railway station
- For passengers interchanging between Indian Railways and HSR or Metro, a Ticket Counter facility for Indian Railways will be provided in HSR terminal concourse
- The Terminal is proposed to be twin structure having G+6 and 5+9 floors respectively with a total covered area of 1,25,541.91sqm. It will have the provision of government offices, commercial and retail outlets for passengers.
-Segregated Pick and Drop Bays for different vehicles types such as Buses, auto, two-wheelers, Private Cars, Taxi etc. have been planned in the Terminal building to avoid congested entry points.
- Parking has been planned in the basement and lower three levels of terminal building to accommodate 1115 cars and 300 two-wheelers for HSR passengers, employees or visitors for proposed office and retail spaces.
The country's first bullet train will traverse the 508-km long distance between Ahmedabad and Mumbai in 2 hours and 57 minutes covering 12 stations including the originating and final station. However, stopping at just two stations, the bullet train will take 1 hour and 58 minutes.
The train will have 10 coaches and will be able to seat as many as 750 passengers in one go.
The project is estimated to be completed by 2022. (ANI)

Get the App

What to Read Next

General News

FCI workers' demands raised before Labour Authority

FCI workers' demands raised before Labour Authority

The ongoing dispute between the management of the Food Corporation of India (FCI) and its sole recognised union, Bhartiya Khadya Nigam Karamchari Sangh (BKNKS), was taken up for conciliation on Thursday before the Deputy Chief Labour Commissioner (Central) in New Delhi.

Read More
General News

Fire breaks out at Sheikh Sarai Transport Authority record room

Fire breaks out at Sheikh Sarai Transport Authority record room

A fire broke out at the old Transport Authority building in Sheikh Sarai Phase 2 area of Delhi on Wednesday night, gutting important documents stored in the record room, officials said.

Read More
General News

SC grants bail to separatist Shabir Shah in terror funding case

SC grants bail to separatist Shabir Shah in terror funding case

In 2019, Shah was arrested in a case registered by the National Investigation Agency (NIA) against him and other separatist leaders in 2017. The separatist leader has not been released from judicial custody ever since.

Read More
General News

SC grants bail to two accused in Siddhu Moosewala murder case

SC grants bail to two accused in Siddhu Moosewala murder case

Pawan Bishnoi was allegedly booked in connection with arranging a Bolero car used in the shooting that killed Moosewala, while Jagtar Singh was booked on a separate ground, along with more than 20 others, in the high-profile murder case.

Read More
General News

Minor children's custody with mother not illegal: Delhi HC

Minor children's custody with mother not illegal: Delhi HC

he Delhi High court while disposing a Habeas Corpus petition held that Minor childrens' custody with mother, who is a natural guardian, can not be termed as illegal. A British Citizen of Pakistan origin Yasir Ayaz had moved a petition of Habeas Corpus for production of his children and their repatriation to the United Kingdom as per the order of UK Family court.

Read More
Home About Us Our Products Advertise Contact Us Terms & Condition Privacy Policy

Copyright © aninews.in | All Rights Reserved.