ADD ANI AS A TRUSTED SOURCE
googleads
Menu
General News

First priority is to remove river bed material to lower Yamuna water level: Uttarkashi DM Prashant Arya

While talking to ANI, Uttarkashi DM Prashant Arya said, "Our first priority is to remove river bed material so that the water level of the Yamuna River comes down. The bridge on the Yamuna River is safe. This is the current situation at Syanachatti"

ANI Aug 28, 2025 21:29 IST googleads

Uttarkashi DM Prashant Arya (Photo/ANI)

Uttarkashi (Uttarakhand) [India], August 28 (ANI): Uttarkashi District Magistrate Prashant Arya on Thursday said that the primary focus of the ongoing rescue and relief operations in Harsil valley and along the Gangotri route is the removal of river bed material (RBM) from the Yamuna River to reduce its water level.
While talking to ANI, Uttarkashi DM Prashant Arya said, "Our first priority is to remove river bed material so that the water level of the Yamuna River comes down. The bridge on the Yamuna River is safe. This is the current situation at Syanachatti"
Providing an update on the situation in Harsil, the DM stated that road connectivity between Harsil and Dharali, previously submerged due to the formation of a temporary lake, has been largely restored, with only 100 metres of the road still underwater.
"Locals here are reporting that road subsidence has increased. We must address this situation now. We must ensure the safe movement of people and their safety. The 800-meter road between Harsil and Dharali, which was submerged by a temporary lake, has been restored, with only 100 meters remaining underwater. Now, we have road connectivity up to Harshil, where excavators and heavy machinery have been deployed," he added.
The DM further stated that there were no issues on the Gangotri Yatra route and that work is ongoing to restore the Yamunotri Yatra route.
"There are no issues on the Gangotri yatra route. We are also hoping to resume the Yamunotri Yatra with the restoration of roads en route," he said.
Meanwhile, the Uttarkashi district administration announced on Thursday that work is underway to increase the water flow at the temporary lake formed near Syanachatti due to the partial blockage of the Yamuna River flow, through desilting and river channelisation efforts.
The temporary lake was formed following an obstruction in the Yamuna River caused by debris from Gadgad Gadera near Syanachatti. Uttarakhand Chief Minister Pushkar Singh Dhami inspected the site and directed officials to remove the silt deposited in the river route and widen the lake's mouth to ensure quicker drainage. (ANI)

Get the App

What to Read Next

General News

Dehradun DM holds meeting to review availability of LPG

Dehradun DM holds meeting to review availability of LPG

The District Magistrate instructed that, in accordance with the guidelines of the Government of India, first priority in LPG distribution should be given to domestic consumers so that the general public does not face any inconvenience. He also directed that home delivery of domestic LPG cylinders should be ensured through an OTP-based system

Read More
General News

President Murmu to visit Ram Janmabhoomi Temple on March 19

President Murmu to visit Ram Janmabhoomi Temple on March 19

President Droupadi Murmu will visit the Ram Janmabhoomi Temple in Ayodhya on March 19, Ayodhya District Magistrate Nikhil Tikaram Funde said.

Read More
General News

Uttarakhand govt allocates Rs 1000 crore for Haridwar Kumbh Mela

Uttarakhand govt allocates Rs 1000 crore for Haridwar Kumbh Mela

According to an official statement from the Chief Minister's office, "sacred land of the Ganga River, Yamuna River, the Char Dham, Adi Kailash and several revered Shakti Peeths, Uttarakhand has long been a center of faith for Sanatan followers across the world. In this context, the state government is making efforts to promote Uttarakhand as a major hub for religious and spiritual tourism and pilgrimage, which is also expected to boost economic activities in the state."

Read More
Politics

Uttarakhand Assembly session: Congress demands discussion

Uttarakhand Assembly session: Congress demands discussion

Leader of Opposition in Uttarakhand Assembly, Yashpal Arya said earlier that the party is hoping for the smooth functioning of the house, and has asked the Speaker to address certain major issues of the state.

Read More
Politics

Telangana CM inaugurates rejuvenated Nalla Cheruvu in Kukatpally

Telangana CM inaugurates rejuvenated Nalla Cheruvu in Kukatpally

Telangana Chief Minister A Revanth Reddy inaugurated the rejuvenated Nalla Cheruvu lake in Kukatpally and reiterated the state government's commitment to restoring water bodies across Hyderabad to address future urban challenges.

Read More
Home About Us Our Products Advertise Contact Us Terms & Condition Privacy Policy

Copyright © aninews.in | All Rights Reserved.